Buh Rein Retirement Estate
    Residential Estates

    Buh Rein Retirement Estate

    Kraaifontein, Cape Town

    379 kWpHybrid Solar
    HybridMax
    Solution
    2026Year

    Project Gallery

    Swipe → (6)

    Project Overview

    Forest Energy designed, built, and commissioned a 379 kWp hybrid solar PV system for Buh Rein Retirement Estate in Kraaifontein, Cape Town. The system comprises 10 x 30 kW Sigenergy hybrid inverters and 1 x 25 kW inverter, connected across nine tie-in points throughout the estate. It was engineered as a fully decentralised system, with every inverter monitored and managed through a single dashboard, and a dedicated fibre network providing reliable connectivity between all inverter locations. Critical facilities were provided with backup power, ensuring the estate and its residents can continue operating essential services during grid outages. The system is fully integrated with the estate's diesel generator and the City of Cape Town DNP3 interface through a Forest Energy-programmed PLC, providing seamless control and grid compliance.

    Key Features

    • 379 kWp solar PV system
    • 10 x 30 kW Sigenergy hybrid inverters plus 1 x 25 kW inverter
    • Nine tie-in points across the estate
    • Fully decentralised design, monitored on a single dashboard
    • Dedicated fibre network linking all inverter locations
    • Backup power for critical facilities
    • Diesel generator and City of Cape Town DNP3 integration via a Forest Energy-programmed PLC

    Results & Impact

    • Reliable power for essential services during grid outages
    • Centralised control and grid compliance across the estate
    • Reduced reliance on grid-supplied power

    Interested in a similar solution for your business?

    Get a Quote